RSB Rig Pro unstep Mystery

RSB Rig Pro unstep Mystery

Published 3 October 2012
Back
Published 3 October 2012

RSB Rig Pro unstepped the 43 meter mast on the Swan 112 earlier this afternoon.

The procedure was delayed a few hours until the the Tripp designed sloop Mystere was lifted out allowing the cranes to set up and Mystery to park in the lifting pit.As the prep work had already taken place the mast was out and on the high load trollies within a couple of hours. The mast will now under go a 4 year rod refit with the diagonal and fore and aft stays being re-headed.

Sign up to the RSB Rigging Solutions newsletter for
all the latest updates and articles